Skip to main content

Power and Energy

Summary

Sector-wise Installed Capacity of Power, 2023 and 2024: Status of Hydro-Electric Capacity (In terms of Installed Capacity-above 25 MW), 2023 and 2024: Per Capita Availability of Power, 2014-15 to 2023-24: Availability of Power, 2013-14 to 2023-24: Installed Capacity of Power, 2013-14 to 2023-24: Power Requirement, 2013-14 to 2023-24: Total Installed Capacity of Grid Interactive Renewable Power, 2015 to 2023: Install Capacity (in MW) of Power Utilizes as on 31-03-2025: Power Supply Position, 2024-25: Cumulative Installed Capacity of Renewable Power, 2023 and 2024: Installed Capacity of Electricity Generation (Utilities), 2023 and 2024: Source-wise Estimated Potential of Renewable Power as on 31-03-2024: Installation of Off-Grid / De-centralized Renewable Energy Systems / Devices as on 31-03-2024: Installation of Off-Grid / De-centralised Renewable Energy Systems/ Devices as on 31-12-2019: State-wise Details of Hydro Potential including Pumped Storage Potential (Installed Capacity - above 25 MW) as on 30-06-2024: Resource-wise Installed Capacity as on November, 2024:

Full Content Requires Login

Login to access the complete content of this page.

Get access to comprehensive data, research reports, and exclusive insights about North East India's economy, resources, and development.

  • Complete access to all research and data
  • Download reports and datasets
  • Exclusive insights and analysis